We have had the plumbing roughed in, foil insulation wrap and roof sarking done, roof tiles laid (ridge capping is still to be fixed into place) and hubby ran some conduit for data and alarm cables.
Ensuite wall mixer plumbing
Kitchen sink plumbing
Powder room basin wall mixer plumbing
Bathroom plumbing. Bath spout under the window, bath wall mixer on the other wall and you can just see the basin wall mixer plumbing to the right
Laundry plumbing
Roof sarking
Roof half tiled
Roof tiled. Ridge capping is still to be fixed into place.
Hubby putting some extra timber in the frame for the family room TV bracket
Conduit and draw wire for theatre room projector.
Looks like the tradies have made themselves a swing on our deck downstairs :-/
We have been told that the bickies will be back after the first week in January and the electrician will commence his rough in 13th January 2014. Aiming for lockup by the end if January. Fingers crossed!