Showing posts with label tiles. Show all posts
Showing posts with label tiles. Show all posts

Tuesday, May 6, 2014

Tiling and Splashback

Our tiling is almost complete! Just a few touch ups and the tile skirts will have to be done in some areas after the toilets are installed.

It's weird how the powder room, bathroom & ensuite cabinets look like they're different colours - they're not. Just bad lighting!

Bathroom shower 

bathroom tiles

Bathroom
bathroom tiles

Powder room
powder room tiles

Ensuite 
ensuite tiles

Splashback tiles - I love how they look different from different angles 
splashback tiles splash back

splashback tiles splash back

splashback tiles splash back

Our gas line was finally trenched in this week.

Tomorrow we have the electrician finishing off and the plumber is starting his fit off. Glass balustrade for the upper deck is due to be done later this week too.

No new handover date as yet. 




Sunday, March 16, 2014

Doors and delays, over it!!

So... It would seem that things are going to be moving at a snails pace again. 

Our internal and external doors were delivered last week but these have not yet been fitted. The chippie who works on our house is lucky to spend 4 hours on site (on the days he bothers to turn up) so I'm not holding my breath for the doors, skirts and architraves to be fitted any time soon.


Even though we were at 'lock up' late January we still do not have the house secured. There are temporary doors in place for the front door and garage internal entry however these are not locked or secured in any way. This annoys me soooo much as I have busted people having a sticky beak through our house. Especially now with the timber floors, timber stairs and cabinetry in I'm even more concerned about the hose being unsecured. To top it off the chippie hung the garage internal entry door so that it swings into the garage and HITS THE STEPS!! I'm mean seriously.... Who does that!?! Before hanging a door wouldn't you check to see that it won't hit anything. The door can't even be opened all the way. I understand it's just there temporarily but it's the possible damage to the stairs I'm worried about. 

I'm also annoyed because I arranged for our tiles to be delivered (also paid for by ourselves) because I stupidly listened to the builder when he said that the external doors would be delivered, fitted and house locked up last week. This now means I have 1.5 tonne of tiles in my garage which I cannot deliver on site because the house isn't secured. I can't even park in my garage now.


Our kitchen has not been installed but this would be because I gave the builder strict instruction that anything I have paid for (I purchased the kitchen doors and panels as well as the microwave and bin that is already fitted) is NOT to be left on site whilst the house is not secured. I did not want to risk damage or theft to these items as they're not covered by the builders insurance and they cost me 1000's. 

I was rather annoyed that two of our bathroom basins were left on site (we supplied these ourselves too) so I took these today as I didn't want to risk them being stolen or damaged. I did initially supply the cabinetmaker with three basins so I'm hoping that the cabinetmaker only took two on site - otherwise it means that one has already gone. I hope that's not the case as those were expensive basins!! 

I had a good look at the internal window frames today. There is only one that isn't damaged or warped. I suppose that's what happens when they're left outside exposed to the weather for months because the framing took so damn long. 

I've tried to remain patient with this build and have not blogged about any of the negative things but it is becoming increasing difficult when it has now been twelve whole months and we STILL are not locked up and secure. 

To top it off it appears that tradies do not give a shit about damaging property. We have had chips taken out of our plaster walls when the doors were delivered, corners dinted, our timber deck was covered in cement from the brickies and now it's stained by the acid used to wash the bricks. The brickie was THE MESSIEST brickie I have ever seen. How he managed to get mortar across all the windows (if I didn't know any better it looks like he threw it on the windows on purpose) I'll never know. There is still some mortar on the windows even after the acid wash. I am afraid that some (if not all) of the windows have been scratched from the mortar. I will not be accepted scratched windows and these will have to be replaced. The walls that the plasterer sanded back (the plasterer was magnificent too, he straightened all our walls as the chippie did a terrible job of 'straightening' them) now have timber glue on them from the guys who laid the timber floors. 

I'm sick of paying for furniture storage as originally we were told we would be in by Christmas. As a result of the delays we cannot put our current home on the market until we move which means we will be paying two mortgages until our home sells and settlement takes place. 

Just between storage fees and additional mortgage payments this place has blown out by 10's of 1000's of dollars just in delays. 

I understand that a custom home on a difficult site takes longer and is more difficult to build. However I would expect that after 12mths the house was locked up. I would also expect that when paying top dollar for a home that the tradies would take a little care around the place. 

I cannot wait to move in and hopefully have the headaches behind us. 

I will not tolerate dinted walls, window frames that are not straight, scratched windows or any other sub-standard work. Before we signed the build contract I advised the builder that I was VERY fussy.

I'm getting over it very, very quickly. 

Thursday, June 13, 2013

Splashback tiles - got 'em!

A couple of weeks ago we received a phone call to tell us our splashback tiles have arrived from Italy and were in the supplier's warehouse awaiting collection or delivery. I opted to pick them up myself as I wanted to inspect them for any possible damage that could have occurred during shipping. These tiles aren't cheap so I'm a little paranoid!  So today we took the trip down to the Geelong warehouse to pick them up. All the tiles were in perfect condition so we were pretty relieved with that.

This tile looks different in different lighting and from different angles, which I suppose is why I love them so much. 

These tiles are called Intensity Auroa Texture in the colour white and they're made by Atlas Concorde. 

Here is a pic of the tile up on the wall in the showroom. You can see how it's almost like a mirror in some parts under artificial lighting. 

atlas intensity auroa textile tile

Once we got home I took some additional pics to show it in different lighting and angles. 

atlas intensity auroa textile tile

atlas intensity auroa textile tile

atlas intensity auroa textile tile

Here they are all packed up and waiting to be installed, which is still quite some time away. 
atlas intensity auroa textile tile

Whilst at the tile warehouse I spotted the tile that we chose for our wall tiles in the bathroom and ensuite so I took a pic to share as the other pic was of a tiny sample tile. I took a few different angles so you can see the texture/pattern. 

Entiva Ferrari white tile

Entiva Ferrari white tile

Entiva Ferrari white tile

We spoke with the builder this morning. Our slab was meant to be done this week but we have had nothing but constant rain in Melbourne this week and it looks like it will continue all through next week as well. So we are waiting on the weather to clear before they can lay the drainage and pour our slab. 

Since the last update they have filled the cavities of the retaining walls with concrete. 



We also have a power box on site. 


Hopefully next update I will have some slab photos to share :-)






Saturday, February 9, 2013

Signed, sealed... not yet delivered.

In the last few days so much has happened, but yet so little in the big scheme of things.

We have secured the kitchen finish I want at a price we can afford ($6000 cheaper than what the builder quoted!!) because we are going direct to the supplier plus we have and a few small things amended on our building contract -

  • The excavation/site costs have now been removed from the provisonal sums. This should avoid any nasty 'site cost' surprises during construction. 
  • We have been given some extra water taps and outdoor power points. 
  • We now have the gas point to the alfresco included. 
  • Our staircase is being upgraded to a solid timber staircase. 
  • We are getting 3 phase power included. 

Contracts signed with the builder today. Things are looking good for a site start in March!!

I visited a tile supplier/importer yesterday and arranged a great deal on some Italian imported tiles. Now things are starting to feel very real...

Watch this space as construction photos will be coming soon-ish (March) !!!