Thursday, June 12, 2014

Woke up and everyone was dead!

Two weeks ago I woke up to find that everyone except us were dead. By 'everyone except us' I meant the tradies, and by 'dead' I meant noticeably absent from the house...

Some facts:

It has been TWO WEEKS since any trades were on site - excluding the trades we organised (balustrades and driveway) and excluding the site supervisor who was cleaning up on Monday. 

We are more than THREE MONTHS past contract. That is three months over on a 12 month build contract. It has been more than 15 months since we commenced building.

Each month that ticks over is now costing us THOUSANDS per month in additional mortgages and furniture storage fees. 

There are still things to be rectified that are outstanding. We flagged many of these issues with the builder MONTHS ago. 

We were obviously naive in thinking that there would be a hive of activity trying to get us to completion as they are so far over contract. The way things are looking we are lucky if we get to move in by August. 

We are both OVER IT. 




Monday, June 9, 2014

Glass balustrade and driveway

Our glass balustrades have been installed upstairs. Downstairs we have the balustrade and glass pool fencing gate. The rest of the pool fencing will be installed once the spa is in place and the decking continued around the spa.

Upstairs balustrade
glass balustrade

glass balustrade

Downstairs pool gate 
glass balustrade

The rest of the balustrade downstairs 
glass balustrade

The driveway turned out perfectly. The guys did an awesome job and the curves of the driveway are subtle. A great exposed aggregate mix too. The company is called 1300driveways and I would recommend them in a heartbeat. If you phone them make sure you request for Chris to do your job. They have other concreters (which are probably just as good) but Chris did our job and he was brilliant to deal with.
exposed aggregate driveway

exposed aggregate driveway

exposed aggregate driveway

exposed aggregate driveway

Today we started securing merbau to the galvanised steel posts under the alfresco/upper deck. In this picture we have clamps temporarily holding the timber in place.
glass balustrade

Since. My last blog update we also finally had the drainage run at the front of the garage and front of the house. We also had our downpipes connected. This has made a huge difference to the amount of water entering the subfloor area, and to be honest, I'm not sure why it took them so long to do this. 

Agi to the front of the house

Agi to the front of the garage 

The concreter (actually, the same guy who did our driveway) is also doing the infill slab for the storeroom. As he is doing that next week we have also asked him to lay the slab for our spa at the same time. This means that the spa slab should be down by 20th June. How exciting!

The caulkers are coming tomorrow to caulk around the tiles, showers, basins etc. I think this will make such a difference and really tidy things up. 

The next two weeks should be a hive of activity with things getting finished outside and inside the house. 


Saturday, May 31, 2014

Mirrors, Teahouse and Decking

Went past the house today to take some pictures and look at the excavation of the driveway before it gets boxed up on Monday.

A few updates since my last post...

Dulux Teahouse to the theatre room. Cornice and ceiling also painted in Teahouse. 
dulux teahouse

dulux teahouse

dulux teahouse

Dulux Teahouse also used for part of the man cave. Ignore the bowing skirting boards, they are just tacked in temporarily. We have to remove them to lay our flooring after handover.
dulux teahouse

dulux teahouse

Lower deck is well on the way. Our spa will sit off the end opposite the single door (near the alcove bit) then the deck will continue around the spa. 
merbau deck

merbau deck


Mirrors are fitted to the ensuite, powder room, bathroom and downstairs powder room.
bathroom mirror

ensuite mirror

bathroom mirror


powder room mirror

Cornice fitted to the alfresco which finishes it off nicely. 


Pic of the front. You can see the parapet is yet to the fixed and the rain head collector is still to be moved. Excavation for the driveway has started. I can't wait until the front is fixed and rendered, it looks like an eyesore at the moment.

I cannot wait until the house is cleaned. At the moment there is dust and mud everywhere. I know that is to be expected on a building site but it still bothers me! 


Today I also met with Caitlin and her family who I came in contact with through blogging. They are building with the same builder and are currently in the early stages of having their frame built. It was a pleasure to meet them and take them through our home. This is the link to her blog if you want to follow their building journey http://themorrisontrio.blogspot.com.au/

Wednesday, May 21, 2014

Shelves and handles

The interior door handles have been fitted - Gainsborough Lianna in satin finish.
gainsborough lianna satin finish

Built in robes and walk in robe shelf and rails have been fitted. This is about one third of the walk in robe. I think I'll put some drawers up one end. Still deciding whether to have something built or whether to just get some drawers from Ikea. 
walk in robe

The linen closet has also had shelving fitted. 
linen closet

I took a quick shot of the skyline. It will be nice looking at all the lights at night time. 
dusk view

The kitchen at night. Half the lights aren't on in this picture. I'm considering putting some lights under the overhead cupboards. I'm still unsure though... 

Found out today that we can't get our driveway done next week as the plumber won't be able to finish the site drainage at the front until early next week. So we have had to delay the driveway - again. Fingers crossed the concreter can fit us in soon so it doesn't delay things too much further. It's important that we get the driveway poured as they can't build the porch deck until the driveway is finished. 

The frame for the lower rear deck has been started which is good. 

Hopefully we aren't too far away from completion. My guess is that we are at least 4 weeks away. 



Saturday, May 17, 2014

Carpets, garage door and shower screens!

The last couple of days have been quite positive with the carpets, shower screens and garage door installed.

I'm very impressed with the garage door. It's very quiet compared to other doors we've had in the past. The door is from EcoGarage Doors. 

Garage door in Ribline profile, Monument colour. 
ribline garage door colorbond monument

ribline garage door colorbond monument

The garage door is insulated which I think is a great idea. The back of the door looks much neater too. 
insulated garage door

ecogarage door

Hubby wired up a button in the garage that we press to open and close the door. Saves us having to use the remote. The face plate has been taken off as the painters still have to paint the garage. 


Shower screens were also installed today in the bathroom and downstairs powder room.

bathroom

bathroom

The carpet layer was there yesterday laying the carpet to the study (aka spare bedroom / sitting room) and theatre room. These are the only two rooms in the house with carpet. 

We went with the builders standard Flinders Green carpet in Taupe. It's a nice warm mid grey colour and I think it will look great with Dulux Teahouse walls in the theatre (when they get painted) and it looks good with the Dulux Beige Royal half walls in the spare room/sitting room. I'm not sure how it rates in terms of quality but for two low traffic areas I figured it wasn't worth upgrading. 

flinders green carpet taupe

flinders green carpet taupe

flinders green carpet taupe

flinders green carpet taupe

flinders green carpet taupe

Thursday, May 15, 2014

Polished timber and driveway aggregate selection

Today we were able to go inside the house again since the timber floors were sanded and lacquered. The timber looks so much better as there is more contrast and definition in the timber now that it's lacquered. There is still one more sand and lacquer to be done but this will be done at the very end. The final lacquer will finish it off perfectly.

Now for some pictures... 

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

tasmanian oak floor

We visited a factory in Hallam and purchased a whole heap of these magnetic door stops. We seem to have great cross breezes through the house which causes the doors to slam so we thought magnetic door stops would be the way to go. These ones will match our Gainsborough Lianna door handles quite nicely.

magnetic door stop

We also took the opportunity today to visit Mentone Premix, on advice from our concreter, to pick the aggregate mix for our driveway. We ending up choosing a mix called Third 5%. It's a lighter colour with earthy tones and specks of black throughout.

exposed aggregrate driveway third 5%

A site clean was happening today so the front and back looks much better. Now that the front has been cleared the plumber can install the drainage and agi pipes to the front of the house. Fingers crossed this is finished soon as our driveway is booked in for Monday 26th May and we don't want to have to reschedule him again.